What does AI productivity imply for agency remuneration?
Task-level gains, service costs and the measurement of marketing value
Abstract
Evidence that AI improves a task does not directly determine a service fee. This review examines 15 sources spanning workplace productivity, contract incentives, technical efficiency and advertising measurement. Experiments estimate outcomes under specified conditions; contracting theory analyses relationships under assumptions. Task savings reach service economics through task composition, complementary investment, review and demand. Output measures need stable acceptance criteria; outcome-linked payments introduce attribution and controllability questions. The literature supports comparisons of scope, quality and full cost without establishing a universal fee reduction or optimal allocation of savings.
This retrospective review considers source versions available by 25 September 2026. The cutoff defines the evidence included; preparation and source checking took place on 21 October 2026.
Keywords: agency remuneration; AI productivity; marketing procurement; output pricing; incrementality
Contents
- Abstract
- 1. Productivity, price and the contract
- 2. Method and evidence hierarchy
- 3. What the productivity studies measure
- 4. From a task saving to a service cost
- 5. What remuneration research establishes
- 6. Labour, output and outcome measures
- 7. Quality standards and the apparent price of AI work
- 8. Complementary investment and the timing of gains
- 9. Interpreting a fee comparison
- 10. Limitations and conclusion
- Source access and appraisal register
- References
1. Productivity, price and the contract
What follows for agency remuneration when AI reduces the effort required to produce some marketing work? The immediate temptation is to apply a productivity estimate to the entire fee. That calculation assumes that the estimate covers every activity, that saved effort becomes a cash saving and that the commercial agreement transfers the saving to the client. None of those assumptions follows automatically from evidence that a tool speeds up a particular task.
A fee is the price of a specified contractual scope. Production cost is the resource expenditure needed to fulfil that scope. Value concerns what the client obtains from the work, while profit is a residual after relevant costs. These quantities can move in different directions. A supplier can reduce cost and hold price constant; a client can commission more work for the same fee; or a lower price can accompany a smaller scope. Observing a fee change without the scope and quality standard leaves its economic interpretation incomplete.
This review examines the connection between empirical productivity findings and those commercial distinctions. It brings together workplace experiments, contracting theory and evidence about measurement. The purpose is to identify what the literature can establish about the basis of a fee comparison. It supplies no recommended percentage fee reduction and no estimate of the profitability of an individual agency or client relationship.
2. Method and evidence hierarchy
Searches on 21 October 2026 covered generative AI productivity, professional writing, knowledge-worker performance, agency remuneration, contract incentives, unit economics and advertising measurement. 15 sources were selected from primary records, author repositories and dated practice publications, bounded by 25 September 2026. Selection is purposive, without an exhaustive search, preregistered protocol, independent extraction or meta-analysis. Later survey findings are excluded from the earlier evidence base.
The sources answer different questions. Randomised experiments estimate effects of access under experimental conditions. The customer-support field study concerns a workplace implementation. Contracting theory analyses incentives and risk allocation under assumptions. A framework identifies accounting concepts. These forms are compared according to their questions rather than counted as interchangeable evidence that an entire service fee changes by a particular amount.
Publication versions are distinguished. The customer-support manuscript is a 2024 revision; the writing experiment uses its published abstract. The contracting reference is the original 1991 multitask analysis [5]. It distinguishes measured performance from the broader activity covered by a contract. It is not a survey of AI adoption in agencies or evidence of the prevalence and financial performance of remuneration models in 2026.
3. What the productivity studies measure
Noy and Zhang's experiment reports reduced time and improved rated quality on incentivised professional writing assignments [1]. These are task-level outcomes under assigned access. They do not measure annual agency costs or the distribution of savings between contracting parties. A writing assignment also contains only part of a client relationship: scope definition, stakeholder negotiation and accountability for deployment may lie outside the experimental task.
Brynjolfsson, Li and Raymond examine a conversational assistant in customer support and report heterogeneous effects across workers [2]. The outcome concerns issues resolved per hour in that setting. The relevant lesson for a fee calculation is heterogeneity: the composition of tasks and workers affects the aggregate result. A service delivered largely by experienced specialists need not experience the same change as a service containing many standardised tasks performed by less experienced staff.
Dell'Acqua and colleagues' consulting experiment reports improvements on tasks within the assessed capability frontier and worse performance on a selected task outside it [3]. A production bundle can contain both kinds of work. An average saving observed across one bundle cannot be applied to a different bundle without knowing the composition. The study provides a reason to evaluate the actual scope, while leaving the commercial division of any resulting benefit unresolved.
The experiments also distinguish potential from realised production change. Access to a tool may improve performance in a supported task, yet an organisation can retain approval stages or use released capacity for further refinement. Observed hours at one stage may fall while total elapsed time changes little because another stage is the bottleneck. The fee consequence depends on what the service promises and which resources can actually be reallocated.
Four quantities that a productivity claim does not combine
Task performance
Time and quality under a specified intervention.
Service cost
All resources needed to fulfil the agreed scope.
Contract price
The amount paid for the specified responsibilities.
Client value
The benefit obtained, requiring its own outcome evidence.
4. From a task saving to a service cost
4.1 The composition of the assignment
A marketing assignment can include research, strategy, concept development, production, localisation, checking and coordination. This is an accounting decomposition rather than a claim that every agency follows the same process. Each activity can have a different exposure to AI and a different criterion for success. Applying one productivity number to the entire scope implicitly assumes equal effects across these activities, including those not studied.
The mathematically relevant quantity is the weighted change across the included work, with weights representing the appropriate shares of resource cost. Even a large saving on a small component may have a limited effect on total cost. Conversely, repeated routine tasks can account for a substantial share of a service. The weights need observation. Their inclusion in an equation does not establish their values or the stability of the task mix over time.
Additional resource use must enter the comparison. Model charges, data preparation, review and recovery from failures can offset some gross effort savings. Sculley and colleagues' technical-debt account identifies ongoing system dependencies as a source of maintenance obligation [8]. Its relevance here is the existence of those surrounding costs, not a measured surcharge for generative agency work. An analysis that counts automation benefits while excluding the resources required to sustain the automation has an asymmetric boundary.
4.2 Cash expenditure and released capacity
A reduction in task hours can produce several observable outcomes. Overtime or contractor expenditure may fall. Employees may take on more work. A team may improve a deliverable within the existing schedule. These are different uses of capacity, with different effects on cash spending. A salary is not reduced simply because a task takes fewer minutes. Treating the same released hours as both a payroll saving and extra output would double count the benefit.
The FinOps Framework places unit economics within business-value measurement [7]. A price-per-output comparison needs a specified accepted deliverable. Complexity, revision and quality requirements remain part of that definition. An adaptation requiring new evidence and substantive rewriting is a different task from mechanical format conversion. Treating both as identical output units conceals task composition, regardless of the remuneration label.
Opportunity cost remains relevant even when cash spending does not change. Time used for avoidable correction cannot simultaneously be used for other client work. Reporting both effort and expenditure makes the distinction visible. A comparison can then show that capacity increased while the cash base remained constant, rather than claiming that an unobserved reduction in payroll occurred. The commercial agreement determines whether that capacity is sold, retained or redirected.
5. What remuneration research establishes
Holmström and Milgrom analyse a principal–agent setting with multiple activities or dimensions of performance [5]. Incentives attached to measured work can alter effort across the wider task. Strong output incentives are not automatically optimal merely because an observable measure exists. The analysis is conditional on a model, rather than an estimate of the effects of changing an agency contract or introducing generative AI.
A client’s intention to change remuneration is not evidence of an achieved saving. The coexistence of AI adoption and a different contract does not identify how much change the technology caused. Even when a supplier reports fewer production hours, a comparison needs to specify the work included, whether quality remained comparable and whether resources were released. These observations differ from the remuneration label.
A model’s scope also matters. A theoretical result about incentive design does not describe the distribution of agency contracts in the market. A global service relationship can bundle markets, media, production and governance differently from a single assignment. The model provides a way to examine the resulting incentive and measurement questions, but it does not supply a market-clearing price for creative judgement or routine production. That price would require evidence on the actual scope, quality, costs, alternatives and commercial setting of the service being compared.
Contract definitions create different measurement tasks. A deliverable has specified acceptance criteria; a broad strategic assignment can include activities unrepresented by an output count. Describing that difference does not establish which arrangement performs better. The review separates the measured unit from the complete work and risk it represents. The selected evidence contains no comparative estimate justifying a universal efficiency ranking of remuneration models.
Payment measures expose different uncertainties
| Pricing reference | What is observed | What remains to be established |
|---|---|---|
| Labour | Hours, staffing or effort | Useful output per unit of effort |
| Output | Count of accepted deliverables | Scope equivalence and consistent quality |
| Outcome | A specified downstream result | Incremental contribution and controllability |
| Hybrid | A combination of measures | How the components interact |
6. Labour, output and outcome measures
A labour-based fee uses effort or staffing as a pricing reference. Its advantage as a measure is observability: hours and roles can be recorded. Its limitation is that identical effort does not establish identical useful output. If a process becomes more efficient, an unchanged hours requirement can weaken the connection between the recorded input and the work the client needs. Whether that leads to a fee revision depends on the contract and renegotiation.
An output-based fee requires a definition of the deliverable and the revisions included. Otherwise an increase in the number of files can be mistaken for an increase in completed concepts. Quality thresholds, usage rights and coordination requirements can all change the resource burden without changing the headline count. An output measure therefore needs a boundary around what is being accepted. The number itself cannot resolve disagreements about scope.
Outcome-linked remuneration adds a causal measurement problem. Sales, profit or brand response can change because of pricing, distribution, seasonality or competitive activity. A correlation between a campaign and a favourable result does not establish the campaign's incremental contribution. Gordon and colleagues' comparison of observational and experimental advertising estimates illustrates the difficulty of recovering causal effects even with granular platform data [6]. The result is directly relevant to interpreting outcome metrics, while leaving individual contract design unsettled.
Measurement noise also affects interpretation. An outcome can be influenced by an agency while remaining difficult to estimate precisely over a short reporting window. Conversely, a precisely measured operational metric may be only loosely related to the client's ultimate objective. The distinction is between the reliability of the measurement and the relevance of what it measures. A fee formula based on a convenient metric does not establish that the metric captures the desired value.
The allocation of responsibility changes the interpretation further. An agency may control creative work but have limited influence over product availability or the media budget. An outcome measure spanning all of those factors can expose the supplier to variation beyond its decisions. Stating that limitation does not establish which contract is optimal. It identifies a property that must be considered when comparing the incentives and risk allocation of different measures.
7. Quality standards and the apparent price of AI work
HELM's multidimensional evaluation approach shows why quality cannot always be represented by one score [9]. In a service comparison, factual accuracy, suitability for the task and usable formatting can have different roles. A deliverable that fails a mandatory requirement may be unusable even if it is fluent or visually attractive. A cheaper route assessed against a looser requirement has not demonstrated an efficiency gain at a constant standard.
Model-routing research provides a technical analogue. FrugalGPT and RouteLLM investigate allocating work across models to improve cost-performance trade-offs [10] [11]. Their findings concern selected tasks and evaluation criteria. They establish that model choice can be query-dependent, while leaving the labour and commercial context outside the test. A supplier's use of a cheaper model therefore neither proves nor disproves a reduction in the full cost of accepted work.
Review effort links these layers. A model route can lower direct usage cost but create more correction, or consume more inference while reducing the work needed to reach acceptance. Comparing raw generation time obscures that difference. A meaningful service comparison retains total attempts, rejected outputs and human checking. It also specifies who performs the checking, because transferring it to the client can make the supplier's process appear cheaper while leaving the combined process unchanged.
The same issue arises with rework after delivery. A nominally accepted output may need correction when it encounters a different market, channel or stakeholder. If the acceptance window is too short, the cost of that correction falls outside the measured period. A consistent comparison defines how post-delivery defects are handled and records the period over which they are observed. The literature reviewed here supplies no universal defect allowance for AI-generated marketing material.
8. Complementary investment and the timing of gains
Brynjolfsson, Rock and Syverson's productivity J-curve model explains how intangible complementary investment can affect measured productivity around a general-purpose technology [4]. This is a framework for interpreting timing and measurement. It does not guarantee that a disappointing AI implementation will eventually become productive. A firm can incur complementary costs without obtaining a sufficient benefit, and a short-run loss is not evidence of a future gain by itself.
For an agency service, complementary work might include restructuring source information, redesigning approval flows or teaching users how to judge outputs. These examples identify possible cost categories rather than claim a measured prevalence. The investment can benefit multiple assignments, making allocation to one fee difficult. Reporting the allocation rule is more transparent than treating shared setup as either costless or entirely attributable to the first project.
The period of comparison should also match the decision. A recurring contract may recover setup over time, whereas a single assignment may never use the system again. An apparently favourable average can conceal an initial investment whose benefit depends on continued demand. Changes in models and client requirements can alter that demand or require further work. A forecast should therefore separate observed current efficiency from assumptions about future reuse.
Acemoglu's task-based economic treatment connects aggregate implications to the share of work affected and the size of task-level savings under its assumptions [12]. The narrow relevance here is aggregation. A large result on one task says little about an entire service without a measure of exposure. The review does not import a macroeconomic forecast into agency pricing; it retains the distinction between a local productivity estimate and the larger bundle to which it is being applied.
9. Interpreting a fee comparison
The first comparison is between two specifications of work. If scope, quality, rights or responsibilities change, the resulting price difference combines those changes with any production efficiency. A like-for-like comparison holds those elements constant where possible and records the remaining differences. This does not require every service to be standardised. It requires enough description to know which claim the comparison can support.
A second comparison concerns costs. Supplier and client costs may move in opposite directions when review or coordination is transferred. Total relationship cost can therefore be informative alongside each party's expenditure. However, complete visibility may be unavailable because some data are commercially confidential. That absence limits the claim: a client can observe its own fee and effort without inferring the supplier's margin from them.
A third comparison concerns effectiveness. If two methods deliver accepted work at different cost, the lower-cost method has an operational advantage under the acceptance rule. Whether it creates equal or greater commercial value remains a further empirical question. Incrementality research shows why exposure and outcomes cannot simply be joined by an attribution label [6]. A contract can choose an outcome metric, but the metric's causal validity still requires a defensible design.
The division of any surplus is a commercial result rather than a direct finding of the productivity literature. Bargaining, alternatives and the scope of the relationship can affect it. The reviewed research does not identify a fair split, an optimal margin or a standard rate card. Its contribution is to expose the unsupported steps in moving from “AI speeds up this task” to “the entire fee should fall by this amount.”
Task–Technology Fit relates individual performance to the relationship between task requirements and technology characteristics. [13] The automation taxonomy distinguishes information processing from decision and action implementation. [14] The human–AI meta-analysis distinguishes augmentation from synergy. A task completed faster with assistance therefore does not determine how much client value was created, which party incurred review work or how a contract allocates the resulting benefit. [15]
10. Limitations and conclusion
The review combines evidence with different populations and levels of analysis. Workplace findings concern selected writing, support and consulting tasks; the contracting paper analyses a model rather than an agency sample. Most research was inspected at abstract or publisher-summary level. The synthesis does not audit agency accounts, reproduce causal estimates or compare live contract outcomes. No pooled productivity coefficient is calculated, and no particular remuneration arrangement is presented as universally superior.
AI can change the cost of some agency activities, but task productivity does not determine the price of an entire relationship. The intervening questions concern task composition, full cost, quality, demand and contractual scope. Remuneration research documents a range of approaches, while advertising measurement research limits simple claims about outcome attribution. The defensible conclusion is conditional: a fee comparison must state what work and responsibility are being bought and what evidence supports the claimed change in cost or value.
Source access and appraisal register
The additional comparative sources in references 13–15 are used for the specific distinctions cited in the discussion. Access is limited to previously inspected primary-source abstracts, publication records or manuscripts. Their inclusion does not imply a fresh full-text risk-of-bias appraisal or direct validation in the application discussed here.
References [1], [2], [3], [4], [6], [8], [9], [10] and [11] were consulted through published or author abstracts and official summaries. The contracting paper’s introduction [5] and dated FinOps poster [7] were inspected. Reference [12] was consulted through indexed author and working-paper summaries; its derivation was not independently appraised. No later remuneration survey enters this snapshot. These limits constrain the conclusions.
References
[1] Noy, S., & Zhang, W. (2023). Experimental evidence on the productivity effects of generative artificial intelligence. Science, 381(6654), 187–192. DOI:10.1126/science.adh2586. Source ↗
[2] Brynjolfsson, E., Li, D., & Raymond, L. (2024 revision). Generative AI at Work. Author manuscript arXiv:2304.11771v2; journal publication 2025. Source ↗
[3] Dell’Acqua, F., et al. (2026). Navigating the Jagged Technological Frontier: Field Experimental Evidence of the Effects of Artificial Intelligence on Knowledge Worker Productivity and Quality. Organization Science, 37(2), 403–423. DOI:10.1287/orsc.2025.21838. Source ↗
[4] Brynjolfsson, E., Rock, D., & Syverson, C. (2021). The Productivity J-Curve: How Intangibles Complement General Purpose Technologies. American Economic Journal: Macroeconomics, 13(1), 333–372. DOI:10.1257/mac.20180386. Source ↗
[5] Holmström, B., & Milgrom, P. (1991). Multitask Principal–Agent Analyses: Incentive Contracts, Asset Ownership, and Job Design. Journal of Law, Economics, & Organization, 7 (special issue), 24–52. DOI:10.1093/jleo/7.special_issue.24. Source ↗
[6] Gordon, B. R., Zettelmeyer, F., Bhargava, N., & Chapsky, D. (2019). A Comparison of Approaches to Advertising Measurement: Evidence from Big Field Experiments at Facebook. Marketing Science, 38(2), 193–225. DOI:10.1287/mksc.2018.1135. Source ↗
[7] FinOps Foundation (2025). FinOps Framework. May 2025 poster; Unit Economics within Quantify Business Value. Source ↗
[8] Sculley, D., et al. (2015). Hidden Technical Debt in Machine Learning Systems. Advances in Neural Information Processing Systems 28. Source ↗
[9] Liang, P., et al. (2023). Holistic Evaluation of Language Models. Author manuscript arXiv:2211.09110v2. Source ↗
[10] Chen, L., Zaharia, M., & Zou, J. (2023). FrugalGPT: How to Use Large Language Models While Reducing Cost and Improving Performance. arXiv:2305.05176. Author version v1 (2023-05-09). Source ↗
[11] Ong, I., et al. (2024; revised 2025). RouteLLM: Learning to Route LLMs with Preference Data. arXiv:2406.18665v4. Source ↗
[12] Acemoglu, D. (2025). The simple macroeconomics of AI. Economic Policy, 40(121), 13–58. DOI:10.1093/epolic/eiae042. Working-paper and author summaries consulted. Source ↗
[13] Goodhue, D. L., & Thompson, R. L. (1995). Task-Technology Fit and Individual Performance. MIS Quarterly, 19(2), 213–236. Original source
[14] Parasuraman, R., Sheridan, T. B., & Wickens, C. D. (2000). A model for types and levels of human interaction with automation. IEEE Transactions on Systems, Man, and Cybernetics—Part A, 30(3), 286–297. Source
[15] Vaccaro, M., Almaatouq, A., & Malone, T. W. (2024). When combinations of humans and AI are useful: A systematic review and meta-analysis. Nature Human Behaviour, 8, 2293–2303. DOI:10.1038/s41562-024-02024-1. Source ↗